Tuesday, March 30, 2010

Aerification, Top Dressing, and Fertilization

Due to Mother Nature's unwillingness to cooperate, the greens aerification scheduled for Monday March 29 has been pushed back to either Wednesday or Thursday the 31st of March and 1st of April. When the conditions of the greens dry down enough this is the process of what we will be doing.







We will be using a .4 inch diameter tine to punch the holes in the greens this time around. We are relieving the thatch layer of organic matter that has built up during the fall and winter months. These holes also allow the release of harmful CO2 gases that are trapped beneath the thatch layer, and allows oxygen into the soil to promote new root growth for the spring.



Using this diameter size of hole will allow for less interruption in the putting surface. With a good combination of sun, rain, and warmer temps the surface should be back to satisfactory conditions within 10 to 14 days.

After the cleanup of cores on the green from the aerifier, we will apply a topdressing of sand to fill the holes with new growing media for the plant and roots. This application of sand also helps smooth out any discrepancies in the surface for better putting conditions after the green has healed.



We also apply calcium, phosphorous, and potassium amendments while the surface of the green is open, so that these nutrients can enter into the root zone and be used by the plant to help produce a new and healthy root system. The sand and amendments are brushed into the holes. (A picture of the brushing procedure will follow up with this post in the coming days)


Goodbye "Old Man" Winter!

Spring time is upon us, it wont be long til trees and flowers on the course will be in full bloom. The slow melt of 40 plus inches during the months of February and March will play a huge role in the color of the turf u will see this spring. Natural Nitrogen levels in the soil are higer than normal due to large amounts of snow.



Friday, March 12, 2010

New Bridge Constructed On Hole #17

Construction of the bridge was completed on Wednesday March 10th, with the exception of a small amount of paving to the cart path on both sides. The paving will be completed next week. The bridge is passable at this time and was opened for play on Thursday March 11th. Below are pictures of the structure:












Tuesday, February 2, 2010

# 17 Bridge Damaged

On Friday, January 14th, the Greens Department continued the winter tree pruning to remove dead and overhaning branches from around the golf course.



While in transport from #18 to #12 tee complex, the lift broke through the deck on the bridge over the creek on #17. Fortunately, no one was hurt and there is only minimal damage to the lift itself. However, the bridge was badly damaged.



Two crane, tow trucks had to be used to free the lift from the creek.



After the lift was removed and the bridge was inspected, it was deemed too dangerous to repair the current bridge even for temporary use. Since the accident three bridge contracting companies have come out to design a new bridge to cross #17 creek. Bids were due by February 1st and we hope to start construction early in February, as long as Mother Nature doesn't have other plans.



All 18 holes have remained open except for snow cover since the accident. The Greens Department is committeed to providing our membership with a safe, new bridge well before the season starts. We ask that after playing #17 golfers carefully turn around and drive backward through #11 and #10 to access #18. We appreciate your patience.

Friday, January 8, 2010

Snow Pictures from Friday

Last night, just over 1" of snow fell. It shouldn't take long to melt, but we only had 10 holes clear of snow during the week.



Instead of using the snow shovel, Mercedes was able to clear the sidewalks with a back-pack blower in no time.

Tim is blowing off the parking lot with the tractor blower. This snow is light and dry.

With the snow still hanging in the trees, the clubhouse area offered a ton of nice photos.



No one is making the turn right now.

First tee looks open!

Thursday, January 7, 2010

2010 Tree Work

On Wednesday, January 6th, the Greens Department started using a 45' lift as part of our continuing tree management program. Our goal is to remove dead and hanging branches from cart path and in-play areas. The Red Oaks found on property are prone to Bacterial Leaf Scorch which affects the transfer of water within the tree. It may only affect a branch at first, but can spread through the vascular system into other areas. Removing dead branches is the best way to manage it. While we are out, we are removing some low branches that block sun and thin turf.

Jose needs two things before he gets started. First, he has a saftey harness and chaps to protect himself from falling and a misstep with the chain saw. Second, he needs a little coffee to be alert.
Mercedes is working in front of Jose to remove low suckers and overgrowth. He is in there somewhere.

The OB line on #2 was overgrown on the right side.

Once Jose has identified a dead limb, he executes a "three cut removal". An intial first cut to the bottom of the branch allows for give while he cuts it from the top away from the tree. The second cut is a regular downward cut several inches from the trunk of the tree. Since branches are so heavy and well-attached to the tree, a single cut will just rip off the bark once the branch is cut 90% of the way through. Jose's intial cut keeps that from happening. The third cut is a regular cut at the collar of the branch and trunk. This cut is simple, but is the most important to insuring a health healing process.


You can see how a section of the limb closest to the trunk is cut after the bulk of the branch is already down.

Jose is able to reach almost any branch with a 45' lift.

Some areas, such as #6, had many problems with the Baterial Leaf Scorch. Two small trees in this area had to be removed and Jose is busy limbing up any dead material to keep the bacteria from spreading.

Wednesday, January 6, 2010

Aeration- The process and benefits

Before the playing surfaces can be groomed day-to-day for golfers, the soil the turf is grown in must support healthy turf and healing from wear and tear.
Every surface in this picture is aerated, including the green which will see atleast three treatments per year.
The green is aerated and the cores are allowed to dry for several hours. Generally, we use 1/2" tines @ 1.5" spacing. In the summer we deep tine with solid 3/8" tines which don't produce cores.

Several guys use snow shovels to scoop up all of the cores. In the past we used a mechanical core harvester; however, it created scuffs and rutts.

After the cores are scooped up, the green is blown off to remove any remaining debris.
With 5% of the turf surface now open, we take apply most of our yearly amendments. We use high calcium-lime and organic based fertilizer for the calcium content. Gypsum and polycoated potash are used for potassium.


This is high-cal lime. It offers 4 times more calcium than what you will normally find at a garden store.
#18 Green under a layer of topdressing sand. This is also allowed to dry for several hours before it is drug in using a mat made out of cocco leaves. The topdressing sand is a special size which is tested to make sure it is compatable with our native soil.

#1 Green after all of the amendments are applied, the sand is drug in, and it has been rolled to remove any imperfections.

This is an upclose look of a completed green.

This is our goal. 6" roots in mid-July will help us get through the dog days of summer.

This is the view from your golf ball. Without regualer aeration, it will be looking at humps and bumps. Plus without the air and amendments the turf itself won't be healthy enough to make it through the season.